CM
Sonotube & Pier Footing Concrete Calculator
DEEP FOUNDATION ENGINE
•
ASTM C39 / IBC Section 1809
Imperial (ft, in)
Metric (m, cm)
Presets:
4x Deck (12"×48")
6x Pergola (10"×36")
8x Cabin (16"×48")
Tube Diameter
(Inches)
(cm)
8" Form Tube (20 cm)
10" Form Tube (25 cm)
12" Form Tube (30 cm)
14" Form Tube (35 cm)
16" Form Tube (40 cm)
18" Form Tube (45 cm)
24" Form Tube (60 cm)
Piers Count (Qty)
−
+
Embedment Depth (Frost Depth)
48
" Deep
cm Deep
📐
CROSS-SECTION
📋
2D PLAN
🧊
3D ISO
CAD 1:1 SCALE
Concrete Mass
Rebar Mat (40d)
Support Chairs
#57 Sub-Base
SITE PROCUREMENT
Bill of Materials (BOM)
COPY
TOTAL READY-MIX ORDER (10% OVERAGE)
ACI 318
--
--
⚠ Volume < 4.0 cu yds: Inquire with ready-mix supplier regarding short-load dispatch fees ($120–$200).
PRE-MIX BAGS (80 LB)
--
NET COMPACTED VOLUME
--
SPECIFICATIONS & LOGISTICS:
ASTM STANDARDS
Rebar Grid Linear Length:
--
Total Reinforcing Weight:
--
Sub-Base Stone Tonnage:
--
Estimated Material Order Cost:
--
CALIBRATED TO ACI 318-19 / ASTM C94
±0.05%
Powered by CivilMatrix Lab — Deterministic Civil Engineering Suite
↗