How Many 80lb Bags In A Yard
Exact conversion for 1 cubic yard of concrete using 80lb bags: requires exactly 50 bags with 10% safety overage. Pallet breakdown and transit mix notes.
Bill of Materials (BOM)
Concrete must be completely discharged within 90 minutes (or 300 drum revolutions) after water addition at the ready-mix batch plant. Prepare pump, forms, and crew prior to truck arrival.
1' × 80' Concrete Slab Quick-Reference Material & Volume Table
A 1' × 80' concrete slab (80 sq ft) requires between 1.09 cubic yards (at 4" depth) and 1.63 cubic yards (at 6" depth) of ready-mix concrete incorporating an essential 10% safety overage for subgrade variance and formwork deflection. If utilizing pre-mixed bags, plan for 49 to 74 80-lb bags (or 66 to 98 60-lb bags). Grade 60 #4 rebar grid reinforcement requires 13 to 13 twenty-foot sticks tied at 18" on-center spacing with standard 40d tension development lap splices.
| Slab Depth | Concrete Volume (yd³) | 80 lb Bags | 60 lb Bags | Rebar Grid (#4 Grade 60) | Structural Application |
|---|---|---|---|---|---|
| 4" (10 cm) CURRENT SPEC | 1.09 yd³ (0.99 yd³ net + 10%) | 49 bags (0.60 cu ft/bag) | 66 bags (0.45 cu ft/bag) | #4 Grade 60 @ 18" O.C. (13 sticks @ 20', 246 LF, 40d splices) Tension development lap splice: 40 bar diameters (20") per ACI 318 | Shed pads, walkways, backyard patios & foot traffic |
| 5" (13 cm) | 1.36 yd³ (1.23 yd³ net + 10%) | 62 bags (0.60 cu ft/bag) | 82 bags (0.45 cu ft/bag) | #4 Grade 60 @ 18" O.C. (13 sticks @ 20', 246 LF, 40d splices) Tension development lap splice: 40 bar diameters (20") per ACI 318 | Standard residential driveways, light pickup trucks, hot tubs |
| 6" (15 cm) | 1.63 yd³ (1.48 yd³ net + 10%) | 74 bags (0.60 cu ft/bag) | 98 bags (0.45 cu ft/bag) | #4 Grade 60 @ 12"–18" O.C. (13 sticks @ 20', 246 LF, 40d splices) Tension development lap splice: 40 bar diameters (20") per ACI 318 | Heavy 2-car garages, RV pads, commercial workshops, pole barns |
Turnkey Installation Cost Range Estimator
Dynamic total project cost calculator for a 80 sq ft slab. Covers end-to-end turnkey contractor scope: site excavation, subgrade grading, 4" crushed stone base, vapor retarder, #4 rebar grid, ready-mix concrete, pump truck placement, and professional finishing.
Ready-Mix vs. Bagged Concrete Financial Decision Matrix
Side-by-side cost breakdown, crew sizing, discharge windows, physical labor fatigue, and structural cold joint risk analysis.
Ready-Mix Transit Mixer Delivery
Order volume is below 4.0 yd³. Batch plants levy a short-load fee (~$120–$200) for running transit trucks below minimum capacity.
ASTM C94 §12.7 mandates complete discharge within 90 minutes (or 300 drum revolutions) after batching. Overtime incurs detention fees (~$120/hr) and risks flash setting.
Ready-mix dumps 1 yd³ every 2–3 minutes. Adequate placement crew is required to prevent cold seams while raking, vibrating, and bull-floating.
Pre-Mixed Bagged Concrete
Pouring >15 bags exceeds safe wheelbarrow manual mixing capacity. A 9 cu ft mechanical drum mixer rental (~$75/day) is essential.
Calculated at ~0.75 gal potable water per 80 lb bag (ASTM C387). Never add excess water to increase flowability; it destroys compressive strength.
Requires constant 3–4 minute mixer batching turnaround with 2+ dedicated helpers. Any interruption during the pour risks cold seams between batches.
Concrete Slump (ASTM C143) & PSI Strength Interactive Visualizer
Interactive ASTM C143 Abrams slump cone deflection, water-cement ratio (w/c <= 0.45) limits, and 28-day hydration curing trajectory curve.
Never achieve a 6" slump by adding water from the transit mixer hose! Adding 1 gal/yd³ of water increases slump by 1", but drops compressive strength by ~200 PSI, increases drying shrinkage by 10%, and causes surface dusting. To increase workability, order ASTM C494 Type F High-Range Water Reducer (HRWR superplasticizer) at the batch plant.
Strict maximum water-cement ratio of 0.45 required by ACI 318 for exterior slabs exposed to moisture and freezing/thawing. Low w/c prevents capillary water absorption and frost scaling.
Evaluates surface evaporation rate against critical bleed capacity using the official ACI 305R / Menzel Nomograph. When evaporation exceeds 0.20 lb/ft²/hr (1.0 kg/m²/hr), rapid plastic shrinkage cracking is imminent.
Normal Curing Procedures Apply
Evaporation rate is safely below the bleed rate of concrete. Normal finishing operations and standard ASTM C309 membrane curing compound application are adequate.
Ambient air temperature is below 40°F (4.4°C) or concrete mix temperature is below 50°F (10°C). Concrete must be protected from freezing until compressive strength reaches 500 psi (3.5 MPa) per ACI 306R. Deploy thermal insulating blankets (R-value ≥ 2.0 per inch) or heated enclosures. Do NOT place concrete on frozen ground or standing frost.
Early Saw-Cut Joint Timing & Depth Rule
Ideal temperature for controlled hydration. Cut contraction joints before final thermal contraction peak to prevent random uncontrolled diagonal slab cracking.
Aliphatic Alcohol Retarder
Spray water-based monomolecular evaporation retarder immediately after screeding/bull-floating to form an elastic surface film reducing evaporation by up to 80%.
Atomized Fog Misting
Deploy high-pressure atomizing fog nozzles upwind to saturate the air (>80% RH) directly over the pour. Never allow fog droplets to puddle on unhardened paste.
Perimeter Barriers
Erect 6-foot solid windbreaks on prevailing windward sides. Every 5 mph wind speed drop cuts evaporation by ~35%. Provide overhead tarps to block direct solar radiation.
ASTM C309 Membrane
Apply ASTM C309 Type 1-D or Type 2 Class B white-pigmented curing compound at 200 sq ft/gal immediately after final finishing. In severe heat, follow with 7 days wet burlap.
Contractor & Field Execution Guidelines
Subgrade & 4" Stone Base
- • Excavate native subgrade to uniform 8" depth; proof-roll to eliminate soft pockets.
- • Install 4" ASTM #57 crushed limestone compacted to >=95% Proctor.
- • Acts as capillary break stopping ground moisture rise & settlement.
10-Mil Vapor Barrier
- • Install 10-mil Class A poly directly over compacted stone (no sand layer).
- • Overlap sheets minimum 6 inches; seal continuously with acrylic vapor tape.
- • Flash perimeter and penetrations tightly to stop moisture vapor paths.
Rebar Chairs & 40d Lap
- • Support Grade 60 steel on CRSI chairs @ 30"–36" OC in upper-middle third.
- • Maintain 2.0" clear cover above vapor retarder; tie with double-snap wire.
- • Execute 40db tension lap splices (20" overlap for #4 rebar).
Joint Timing & Curing
- • Saw-cut joints @ 1" depth (1/4 T) within 4–12 hr green window.
- • Space joints at max 24x–30x thickness (typically 8'–10' square bays).
- • Apply ASTM C309 curing membrane immediately; 48-hr pedestrian lockout.
1' × 80' Slab Engineering Takeoff
Comprehensive contractor breakdown for how-many-80lb-bags-in-a-yard. Complies with ASTM C387 high-strength packaged concrete specifications. Ordering 50 bags (1.2 pallets) requires approximately 43.8 gallons of clean potable water. Compare total material cost ($325) with local transit ready-mix delivery ($315).
ACI 318-19 §25.4, ASTM C94/C94M, ASTM D698, ASTM C90, IBC 2024.
Deterministic mathematical modeling based strictly on published building codes. Zero promotional bias.
Job-Site Technical Frequently Asked Questions
Q How much concrete is needed for a 1×80 slab at 4 inches thick?
A 1' × 80' concrete slab poured at a 4-inch depth requires 1.1 cubic yards of ready-mix concrete (incorporating an essential 10% safety overage for subgrade variance and formwork deflection), or approximately 50 pre-mixed 80-pound concrete bags (66 60-pound bags). For quantities exceeding 4 cubic yards, ready-mix transit mixer dispatch is strongly recommended.
Q How much does a 1×80 concrete slab cost to install (turnkey)?
A professionally installed turnkey 1' × 80' concrete slab (80 sq ft) typically costs between $480 and $960 ($6 to $12 per square foot installed), with a national average of approximately $680 ($8.50/sq ft). This turnkey cost includes excavation and site grading, a 4-inch compacted crushed stone sub-base, Grade 60 #4 rebar grid reinforcement, ready-mix concrete (1.1 cubic yards or 50 80-lb bags), and complete contractor labor for pouring, screeding, and float/broom finishing.
Q How many 80 lb or 60 lb bags of concrete are needed for a 1×80 slab?
A 1' × 80' concrete slab poured at 4 inches depth requires approximately 50 bags of 80 lb pre-mixed concrete (or 66 bags of 60 lb concrete), reflecting 1.1 cubic yards with a 10% subgrade variance overage. If mixing on site with a portable drum mixer, pouring more than 60 bags in a single shift is not recommended due to physical exhaustion and structural cold joint risks; ready-mix transit mixer truck dispatch is strongly recommended.
Q What rebar grid size and spacing should be used for a 1×80 slab?
Standard structural slab-on-ground construction specifies #4 (1/2-inch) Grade 60 deformed steel rebar tied in an 18-inch on-center orthogonal grid pattern, elevated on 2-inch chairs. Tension development lap splices must measure at least 40 bar diameters (20 inches) per ACI 318-19.
Q How much crushed stone sub-base is required under a 1×80 slab?
A standard 4-inch compacted sub-base of ASTM #57 crushed stone or dense-graded aggregate (DGA) requires approximately 1.6 tons of material. The stone must be compacted in lifts to 95% Standard Proctor density (ASTM D698) to prevent post-pour differential settlement.
Q What is the ASTM C94 delivery window for ready-mix concrete?
Under ASTM C94 and ACI 301 specifications, ready-mix concrete must be completely discharged within 90 minutes (or before 300 drum revolutions) after batch water is introduced to the cement at the batching plant. In ambient heat exceeding 90°F (32°C), this window is reduced to 60 minutes.