Schalungssteine, Hohlblocksteine & Mörtel Rechner
Berechnet Schalungssteine, Hohlblocksteine, Mauermörtel und Füllbeton für Stützmauern und Kellerwände nach DIN EN 771-3 mit Schnittverlust und Bewehrung.
Bill of Materials (BOM)
Volume is under 4.0 cu yds. Most ready-mix batch plants assess short-load surcharges ($120–$200) for loads below minimum batch capacity.
Evaluates surface evaporation rate against critical bleed capacity using the official ACI 305R / Menzel Nomograph. When evaporation exceeds 0.20 lb/ft²/hr (1.0 kg/m²/hr), rapid plastic shrinkage cracking is imminent.
Normal Curing Procedures Apply
Evaporation rate is safely below the bleed rate of concrete. Normal finishing operations and standard ASTM C309 membrane curing compound application are adequate.
Ambient air temperature is below 40°F (4.4°C) or concrete mix temperature is below 50°F (10°C). Concrete must be protected from freezing until compressive strength reaches 500 psi (3.5 MPa) per ACI 306R. Deploy thermal insulating blankets (R-value ≥ 2.0 per inch) or heated enclosures. Do NOT place concrete on frozen ground or standing frost.
Early Saw-Cut Joint Timing & Depth Rule
Ideal temperature for controlled hydration. Cut contraction joints before final thermal contraction peak to prevent random uncontrolled diagonal slab cracking.
Aliphatic Alcohol Retarder
Spray water-based monomolecular evaporation retarder immediately after screeding/bull-floating to form an elastic surface film reducing evaporation by up to 80%.
Atomized Fog Misting
Deploy high-pressure atomizing fog nozzles upwind to saturate the air (>80% RH) directly over the pour. Never allow fog droplets to puddle on unhardened paste.
Perimeter Barriers
Erect 6-foot solid windbreaks on prevailing windward sides. Every 5 mph wind speed drop cuts evaporation by ~35%. Provide overhead tarps to block direct solar radiation.
ASTM C309 Membrane
Apply ASTM C309 Type 1-D or Type 2 Class B white-pigmented curing compound at 200 sq ft/gal immediately after final finishing. In severe heat, follow with 7 days wet burlap.
Popular Slab Dimensions & Structural Takeoffs
Contractor & Field Execution Guidelines
Mortar Type & Joints
- • Use ASTM C270 Type S mortar (1,800 PSI) for below-grade/loadbearing walls.
- • Lay uniform 3/8" head and bed mortar joints; full face-shell bedding.
- • Tool joints with concave jointer when thumbprint hard to weatherseal.
Rebar Lap & Dowels
- • Key foundation dowels matching wall vertical rebar schedule (#4 or #5).
- • Minimum lap splice length is 48 bar diameters (48db = 24" for #4 bar).
- • Tie vertical bars securely to dowels before setting block courses.
Core Grout Consolidation
- • Fill cores with fine or coarse grout with 8"–11" slump for fluid filling.
- • Pour in lifts <= 5 feet; mechanically vibrate within 15 minutes of pour.
- • Re-vibrate after initial water absorption to bond grout to block shells.
Control Joint Spacing
- • Install vertical control joints at maximum 20 to 25 foot wall panel intervals.
- • Locate joints at openings, corners, and wall height changes.
- • Discontinue horizontal joint wire at joint; seal with backer rod & caulk.
Engineering Methodology & Consensus Standards
Für Stützmauern aus Schalungssteinen (24er oder 30er Wandstärke) werden die Hohlkammern nach dem Verlegen mit Bewehrungsstahl versehen und mit Füllbeton vergossen.
ACI 318-19 §25.4, ASTM C94/C94M, ASTM D698, ASTM C90, IBC 2024.
Deterministic mathematical modeling based strictly on published building codes. Zero promotional bias.
Job-Site Technical Frequently Asked Questions
Q Wieviel Füllbeton wird pro m² Schalungsstein benötigt?
Bei einer 24 cm starken Schalungssteinwand werden ca. 130 bis 150 Liter Füllbeton pro m² benötigt.
Q Wieviele Hohlblock- bzw. Schalungssteine pro m² Wandfläche?
Für 1 m² Wandfläche werden ca. 8 bis 10 Steine (z.B. Format 50x25x20 cm) plus 5% Verschnitt benötigt.
Q Wieviel Mauermörtel wird für 100 Steine benötigt?
Man benötigt ca. 3 bis 4 Säcke Trockenmörtel à 30 kg für 100 Steine bei 12 mm Fugendicke.