Bewehrungsstahl, Gitter & Übergreifungslängen Rechner

Ermittelt laufende Meter Bewehrungsstahl, Stangenzahl, Gesamtgewicht in kg, Übergreifungslängen nach DIN EN 1992-1-1 und erforderliche Abstandhalter.

System:
Presets:
Grid Spacing (Both Directions / Each Way) 18 " on-center
6" (Heavy Structural) 12" (Heavy Driveway/Shop) 18" (Standard Slab Mat) 24" (Light Residential)
ACI 318-19 Section 25.4
ARCHITECTURAL BLUEPRINT LEGEND & SCHEMATICS CAD SCALE 1:1 DYNAMIC
Concrete Mass EL. 0.00' Screed
Rebar Mat 40d Tension Lap
Support Chairs CRSI 2.5' OC
Base / Bedding #57 Stone / Poly
SITE PROCUREMENT

Bill of Materials (BOM)

TOTAL READY-MIX CONCRETE ORDER ACI 318
-- --
RETAIL BAG EQUIVALENT --
NET SLAB VOLUME --
SPECIFICATIONS & LOGISTICS: CRSI / ASTM
Rebar Grid Linear Length: --
Total Reinforcing Weight: --
Sub-Base Stone Tonnage: --
Estimated Material Order Cost: --
CALIBRATED TO ACI 318-19 / ASTM C94 TOLERANCE ±0.05%

Evaluates surface evaporation rate against critical bleed capacity using the official ACI 305R / Menzel Nomograph. When evaporation exceeds 0.20 lb/ft²/hr (1.0 kg/m²/hr), rapid plastic shrinkage cracking is imminent.

Presets:
Ambient Air Temperature (Ta) 68°F
40°F (ACI 306R Cold) 70°F (Optimal) 110°F (Extreme Heat)
Concrete Mix Temperature (Tc) 68°F
50°F (Min Allowed) 65–75°F (Normal Batch) 95°F (Max ASTM C94)
Relative Humidity (r) 55%
10% (Arid Desiccation) 50% (Average) 90% (Saturated Air)
Wind Velocity 20" Above Slab (V) 8 mph
0 mph (Calm) 10 mph (Moderate Breeze) 30 mph (Severe Gale)
ACI 305R EVALUATED NOMOGRAPH FORMULA: MENZEL MODEL
E = [ (Tc)2.5 − r × (Ta)2.5 ] × [ 1 + 0.4 × V ] × 10−6
Thermal vapor gradient Δ: 15,238 Wind factor (1 + 0.4V): 4.20
Evaporation Rate E: 0.0721 lb/ft²/hr (0.352 kg/m²/hr)
SURFACE EVAPORATION DIAL ACI 305R §4.2
0.0 0.10 lb 0.20 lb 0.40+
0.072 lb/ft²/hr
(0.35 kg/m²/hr)
SAFE / LOW RISK
ACI 305R STATUS

Normal Curing Procedures Apply

Evaporation rate is safely below the bleed rate of concrete. Normal finishing operations and standard ASTM C309 membrane curing compound application are adequate.

✂️
CONTRACTION JOINT WINDOW

Early Saw-Cut Joint Timing & Depth Rule

Standard Hydration Window
RECOMMENDED SAWING WINDOW 8 – 14 Hours Post-placement window
MANDATORY DEPTH RULE Minimum D / 4 1.0" for 4" slab / 1.5" for 6" slab
MAX JOINT SPACING 24× to 30× Slab Depth 8'–10' for 4" slab / 12'–15' for 6" slab

Ideal temperature for controlled hydration. Cut contraction joints before final thermal contraction peak to prevent random uncontrolled diagonal slab cracking.

Actionable Jobsite Mitigation Protocol (ACI 305R §4.3) DYNAMIC ACTION REGIMEN
01. MONOMOLECULAR FILM OPTIONAL

Aliphatic Alcohol Retarder

Spray water-based monomolecular evaporation retarder immediately after screeding/bull-floating to form an elastic surface film reducing evaporation by up to 80%.

02. MICRO-DROPLET FOG NOT REQUIRED

Atomized Fog Misting

Deploy high-pressure atomizing fog nozzles upwind to saturate the air (>80% RH) directly over the pour. Never allow fog droplets to puddle on unhardened paste.

03. WINDBREAKS & SHADE MONITOR WIND

Perimeter Barriers

Erect 6-foot solid windbreaks on prevailing windward sides. Every 5 mph wind speed drop cuts evaporation by ~35%. Provide overhead tarps to block direct solar radiation.

04. CURING COMPOUND STANDARD REGIMEN

ASTM C309 Membrane

Apply ASTM C309 Type 1-D or Type 2 Class B white-pigmented curing compound at 200 sq ft/gal immediately after final finishing. In severe heat, follow with 7 days wet burlap.

ADVERTISEMENT
Sponsored Space • Policy Buffer Active
FIELD SPECIFICATION CRSI MSP-1 / ACI 318-19 §25.4 / ASTM A615

Contractor & Field Execution Guidelines

01. ACI 318 §20.6

Clear Cover Tolerances

  • • 2.0" clear cover against earth with vapor retarder; 3.0" if unformed to earth.
  • • 1.5" minimum clear cover along formed vertical slab faces and bulkheads.
  • • Never lay rebar flat on ground or pull up during pour ("hooking" fails).
02. ACI 318 §25.4

40d Tension Lap Splices

  • • Grade 60 steel requires minimum 40 bar diameters (40db) overlap length.
  • • #4 (1/2") = 20" minimum lap; #5 (5/8") = 25" minimum lap splice.
  • • Stagger adjacent splices by >=24" to prevent localized stress planes.
03. CRSI Manual

Support Chair Density

  • • Heavy-duty wide-base plastic or cement chairs spaced 30"–36" on-center.
  • • Place chairs directly under intersections; 1 chair per 6–8 sq ft.
  • • Ensures steel stays rigid under worker foot traffic and pump lines.
04. CRSI Tying

Tie Wire & Corner Hooks

  • • 16-gauge black annealed double-snap wire ties at alternating grid joints.
  • • 100% of perimeter rebar intersections must be securely tied.
  • • Bend 90° standard hooks (12 bar diameters) at corners for continuity.
STRUCTURAL GOVERNANCE Deterministic Mathematical Modeling

Engineering Methodology & Consensus Standards

PE / SE AUDITED & CODE-ALIGNED
STRUCTURAL DERIVATION & FIELD TOLERANCES
CRSI MSP-1 / ACI 318-19 §25.4 / ASTM A615

Nach DIN EN 1992-1-1 (Eurocode 2) beträgt die Übergreifungslänge typischerweise das 40- bis 50-fache des Stabdurchmessers.

FORMULATION: DETERMINISTIC VOLUMETRIC TAKEOFF ZERO ESTIMATION DRIFT
PE
CIVIL & STRUCTURAL REVIEW BOARD CivilMatrix Technical Editorial Team | PE / SE Validated
CODE-ALIGNED
Consensus Code Grounding:

ACI 318-19 §25.4, ASTM C94/C94M, ASTM D698, ASTM C90, IBC 2024.

Editorial Review Standards:

Deterministic mathematical modeling based strictly on published building codes. Zero promotional bias.

LAST TECHNICAL CALIBRATION: November 2026 • v2.4
JOB-SITE DIRECTORY

Job-Site Technical Frequently Asked Questions

ACI 318 • ASTM C94 Standard Solutions
Q Wie groß ist die Übergreifung bei 12 mm Rundstahl?
A

Das 40-fache des Durchmessers, also rund 50 cm.

Q Wie groß ist die Übergreifungslänge nach ACI 318 / DIN EN 1992?
A

Das Übergreifungsmaß beträgt mindestens das 40-fache des Stabdurchmessers (40d), bei Ø 12 mm Rundstahl somit mindestens 50 cm.

Q Wieviele Abstandshalter werden für die Bewehrung benötigt?
A

Rechnen Sie mit etwa 1 bis 2 Abstandshaltern pro Quadratmeter für eine sichere Betondeckung von 5 cm.

Q Welche Mindestbetondeckung gilt für Bewehrungsstahl in Bodenplatten?
A

Nach DIN EN 1992-1-1 und ACI 318-19 beträgt die Mindestbetondeckung bei Erdkontakt 75 mm und bei Einbau auf Trennlage/Folie mindestens 50 mm.