Calculadora de Áridos, Grava y Zahorra Compactada
Calcula toneladas y metros cúbicos de zahorra, grava #57 y arena con factor de compactación según ensayo Proctor y viajes de camión basculante en obra.
Bill of Materials (BOM)
Volume is under 4.0 cu yds. Most ready-mix batch plants assess short-load surcharges ($120–$200) for loads below minimum batch capacity.
Evaluates surface evaporation rate against critical bleed capacity using the official ACI 305R / Menzel Nomograph. When evaporation exceeds 0.20 lb/ft²/hr (1.0 kg/m²/hr), rapid plastic shrinkage cracking is imminent.
Normal Curing Procedures Apply
Evaporation rate is safely below the bleed rate of concrete. Normal finishing operations and standard ASTM C309 membrane curing compound application are adequate.
Ambient air temperature is below 40°F (4.4°C) or concrete mix temperature is below 50°F (10°C). Concrete must be protected from freezing until compressive strength reaches 500 psi (3.5 MPa) per ACI 306R. Deploy thermal insulating blankets (R-value ≥ 2.0 per inch) or heated enclosures. Do NOT place concrete on frozen ground or standing frost.
Early Saw-Cut Joint Timing & Depth Rule
Ideal temperature for controlled hydration. Cut contraction joints before final thermal contraction peak to prevent random uncontrolled diagonal slab cracking.
Aliphatic Alcohol Retarder
Spray water-based monomolecular evaporation retarder immediately after screeding/bull-floating to form an elastic surface film reducing evaporation by up to 80%.
Atomized Fog Misting
Deploy high-pressure atomizing fog nozzles upwind to saturate the air (>80% RH) directly over the pour. Never allow fog droplets to puddle on unhardened paste.
Perimeter Barriers
Erect 6-foot solid windbreaks on prevailing windward sides. Every 5 mph wind speed drop cuts evaporation by ~35%. Provide overhead tarps to block direct solar radiation.
ASTM C309 Membrane
Apply ASTM C309 Type 1-D or Type 2 Class B white-pigmented curing compound at 200 sq ft/gal immediately after final finishing. In severe heat, follow with 7 days wet burlap.
Popular Slab Dimensions & Structural Takeoffs
Contractor & Field Execution Guidelines
Subgrade Proof-Rolling
- • Strip all organic topsoil to stable cohesive subsoil stratum.
- • Proof-roll with loaded tandem truck or heavy roller to detect ruts.
- • Excavate soft clay pockets and backfill with structural coarse fill.
Geotextile Separation
- • Install Class 2 non-woven needle-punched geotextile fabric over subgrade.
- • Overlap rolls minimum 12"–18" along seams; stake or pin securely.
- • Prevents stone from migrating down into wet clay under vehicle loads.
Stratified Lift Compaction
- • Place aggregate in loose lifts of maximum 3" to 4" thickness.
- • Compact with vibratory plate compactor (>=3,500 lbs force) or roller.
- • Achieve >=95% Standard Proctor maximum dry density per lift.
Surface Runoff Pitch
- • Grade sub-base with minimum 1/4" per foot (2% cross-slope) toward edges.
- • Ensure water sheds rapidly into side swales to avoid pothole saturation.
- • Top with 2" washed angular stone (#57 or pea gravel) for wear layer.
Engineering Methodology & Consensus Standards
La compactación mecánica reduce el volumen de huecos entre las partículas del árido. Una zahorra bien graduada reduce su volumen aparente entre un 15% y un 20% tras el apisonado.
ACI 318-19 §25.4, ASTM C94/C94M, ASTM D698, ASTM C90, IBC 2024.
Deterministic mathematical modeling based strictly on published building codes. Zero promotional bias.
Job-Site Technical Frequently Asked Questions
Q ¿Cuántas toneladas de grava transporta un camión basculante de tres ejes?
Un camión volquete de tres ejes transporta típicamente entre 18 y 22 toneladas según las limitaciones de peso por eje.
Q ¿Cuántas toneladas carga un camión volquete de tres ejes?
Un camión volquete de 3 ejes transporta de 18 a 22 toneladas de áridos triturados.
Q ¿Cuál es el factor de compactación de la zahorra o base granular?
La zahorra compacta un 18% a 20% bajo rodillo (ASTM D698), por lo que debe solicitarse un 20% extra de volumen suelto.