Calculateur de Granulats, Gravier et Tout-Venant Compacté
Calcule le tonnage et le cubage pour gravillon, tout-venant GNT et sable avec foisonnement et compactage Proctor normalisé pour vos couches de forme.
Bill of Materials (BOM)
Volume is under 4.0 cu yds. Most ready-mix batch plants assess short-load surcharges ($120–$200) for loads below minimum batch capacity.
Evaluates surface evaporation rate against critical bleed capacity using the official ACI 305R / Menzel Nomograph. When evaporation exceeds 0.20 lb/ft²/hr (1.0 kg/m²/hr), rapid plastic shrinkage cracking is imminent.
Normal Curing Procedures Apply
Evaporation rate is safely below the bleed rate of concrete. Normal finishing operations and standard ASTM C309 membrane curing compound application are adequate.
Ambient air temperature is below 40°F (4.4°C) or concrete mix temperature is below 50°F (10°C). Concrete must be protected from freezing until compressive strength reaches 500 psi (3.5 MPa) per ACI 306R. Deploy thermal insulating blankets (R-value ≥ 2.0 per inch) or heated enclosures. Do NOT place concrete on frozen ground or standing frost.
Early Saw-Cut Joint Timing & Depth Rule
Ideal temperature for controlled hydration. Cut contraction joints before final thermal contraction peak to prevent random uncontrolled diagonal slab cracking.
Aliphatic Alcohol Retarder
Spray water-based monomolecular evaporation retarder immediately after screeding/bull-floating to form an elastic surface film reducing evaporation by up to 80%.
Atomized Fog Misting
Deploy high-pressure atomizing fog nozzles upwind to saturate the air (>80% RH) directly over the pour. Never allow fog droplets to puddle on unhardened paste.
Perimeter Barriers
Erect 6-foot solid windbreaks on prevailing windward sides. Every 5 mph wind speed drop cuts evaporation by ~35%. Provide overhead tarps to block direct solar radiation.
ASTM C309 Membrane
Apply ASTM C309 Type 1-D or Type 2 Class B white-pigmented curing compound at 200 sq ft/gal immediately after final finishing. In severe heat, follow with 7 days wet burlap.
Popular Slab Dimensions & Structural Takeoffs
Contractor & Field Execution Guidelines
Subgrade Proof-Rolling
- • Strip all organic topsoil to stable cohesive subsoil stratum.
- • Proof-roll with loaded tandem truck or heavy roller to detect ruts.
- • Excavate soft clay pockets and backfill with structural coarse fill.
Geotextile Separation
- • Install Class 2 non-woven needle-punched geotextile fabric over subgrade.
- • Overlap rolls minimum 12"–18" along seams; stake or pin securely.
- • Prevents stone from migrating down into wet clay under vehicle loads.
Stratified Lift Compaction
- • Place aggregate in loose lifts of maximum 3" to 4" thickness.
- • Compact with vibratory plate compactor (>=3,500 lbs force) or roller.
- • Achieve >=95% Standard Proctor maximum dry density per lift.
Surface Runoff Pitch
- • Grade sub-base with minimum 1/4" per foot (2% cross-slope) toward edges.
- • Ensure water sheds rapidly into side swales to avoid pothole saturation.
- • Top with 2" washed angular stone (#57 or pea gravel) for wear layer.
Engineering Methodology & Consensus Standards
Le compactage mécanique d’une sous-couche en grave non traitée (GNT) entraîne une diminution de volume d’environ 15 à 20 % qu’il convient de majorer lors de la commande en carrière.
ACI 318-19 §25.4, ASTM C94/C94M, ASTM D698, ASTM C90, IBC 2024.
Deterministic mathematical modeling based strictly on published building codes. Zero promotional bias.
Job-Site Technical Frequently Asked Questions
Q Quelle charge utile pour un camion benne 6x4 ?
Un camion 6x4 (3 essieux) transporte généralement environ 14 à 16 tonnes de gravier ou tout-venant.
Q Quelle est la capacité d'un camion benne 6x4 (3 essieux) ?
Un camion benne 6x4 transporte entre 15 et 20 tonnes de granulats selon la tare du véhicule.
Q Quel coefficient de compactage pour la grave concassée ?
Une grave concassée compacte de 15% à 20% sous plaque vibrante (ASTM D698), prévoyez 20% de volume en plus.