Calculadora de Degraus e Escadas de Concreto Armado

Calcule o volume em metros cúbicos (m³), sacos de cimento de 25kg, área de fôrmas de madeira e vergalhões de aço para degraus e escadas de concreto armado.

System:
Presets:
Default: 11" (IBC / IRC)
Default: 7" (Max 7.75")
Platform Depth (0 = None)
NBR 9050 / ACI 318-19 / IBC 1011
ARCHITECTURAL BLUEPRINT LEGEND & SCHEMATICS CAD SCALE 1:1 DYNAMIC
Concrete Mass EL. 0.00' Screed
Rebar Mat 40d Tension Lap
Support Chairs CRSI 2.5' OC
Base / Bedding #57 Stone / Poly
SITE PROCUREMENT

Bill of Materials (BOM)

TOTAL READY-MIX CONCRETE ORDER ACI 318
-- --
RETAIL BAG EQUIVALENT --
NET SLAB VOLUME --
SPECIFICATIONS & LOGISTICS: CRSI / ASTM
Rebar Grid Linear Length: --
Total Reinforcing Weight: --
Sub-Base Stone Tonnage: --
Estimated Material Order Cost: --
CALIBRATED TO ACI 318-19 / ASTM C94 TOLERANCE ±0.05%

Evaluates surface evaporation rate against critical bleed capacity using the official ACI 305R / Menzel Nomograph. When evaporation exceeds 0.20 lb/ft²/hr (1.0 kg/m²/hr), rapid plastic shrinkage cracking is imminent.

Presets:
Ambient Air Temperature (Ta) 68°F
40°F (ACI 306R Cold) 70°F (Optimal) 110°F (Extreme Heat)
Concrete Mix Temperature (Tc) 68°F
50°F (Min Allowed) 65–75°F (Normal Batch) 95°F (Max ASTM C94)
Relative Humidity (r) 55%
10% (Arid Desiccation) 50% (Average) 90% (Saturated Air)
Wind Velocity 20" Above Slab (V) 8 mph
0 mph (Calm) 10 mph (Moderate Breeze) 30 mph (Severe Gale)
ACI 305R EVALUATED NOMOGRAPH FORMULA: MENZEL MODEL
E = [ (Tc)2.5 − r × (Ta)2.5 ] × [ 1 + 0.4 × V ] × 10−6
Thermal vapor gradient Δ: 15,238 Wind factor (1 + 0.4V): 4.20
Evaporation Rate E: 0.0721 lb/ft²/hr (0.352 kg/m²/hr)
SURFACE EVAPORATION DIAL ACI 305R §4.2
0.0 0.10 lb 0.20 lb 0.40+
0.072 lb/ft²/hr
(0.35 kg/m²/hr)
SAFE / LOW RISK
ACI 305R STATUS

Normal Curing Procedures Apply

Evaporation rate is safely below the bleed rate of concrete. Normal finishing operations and standard ASTM C309 membrane curing compound application are adequate.

✂️
CONTRACTION JOINT WINDOW

Early Saw-Cut Joint Timing & Depth Rule

Standard Hydration Window
RECOMMENDED SAWING WINDOW 8 – 14 Hours Post-placement window
MANDATORY DEPTH RULE Minimum D / 4 1.0" for 4" slab / 1.5" for 6" slab
MAX JOINT SPACING 24× to 30× Slab Depth 8'–10' for 4" slab / 12'–15' for 6" slab

Ideal temperature for controlled hydration. Cut contraction joints before final thermal contraction peak to prevent random uncontrolled diagonal slab cracking.

Actionable Jobsite Mitigation Protocol (ACI 305R §4.3) DYNAMIC ACTION REGIMEN
01. MONOMOLECULAR FILM OPTIONAL

Aliphatic Alcohol Retarder

Spray water-based monomolecular evaporation retarder immediately after screeding/bull-floating to form an elastic surface film reducing evaporation by up to 80%.

02. MICRO-DROPLET FOG NOT REQUIRED

Atomized Fog Misting

Deploy high-pressure atomizing fog nozzles upwind to saturate the air (>80% RH) directly over the pour. Never allow fog droplets to puddle on unhardened paste.

03. WINDBREAKS & SHADE MONITOR WIND

Perimeter Barriers

Erect 6-foot solid windbreaks on prevailing windward sides. Every 5 mph wind speed drop cuts evaporation by ~35%. Provide overhead tarps to block direct solar radiation.

04. CURING COMPOUND STANDARD REGIMEN

ASTM C309 Membrane

Apply ASTM C309 Type 1-D or Type 2 Class B white-pigmented curing compound at 200 sq ft/gal immediately after final finishing. In severe heat, follow with 7 days wet burlap.

ADVERTISEMENT
Sponsored Space • Policy Buffer Active
FIELD SPECIFICATION IRC R311.7 / IBC 1011 / ACI 318-19

Contractor & Field Execution Guidelines

01. IRC R311.7

Riser & Tread Uniformity

  • • Maximum step riser height: 7-3/4" (196 mm); minimum tread run: 10"–11".
  • • Maximum tolerance variance between greatest and least rise/run is <= 3/8".
  • • Pitch treads 1/8" per foot forward for positive surface water drainage.
02. ACI 318 §25.5

Foundation Tie-In Dowels

  • • Tie into foundation/porch with 1/2" (#4) rebar epoxy dowels @ 12" OC.
  • • Embed dowels minimum 4" into cured concrete with structural epoxy.
  • • Prevents step stair unit from pulling away or tilting over freeze-thaw.
03. ACI 318 Rebar

Stringer Reinforcement

  • • Run diagonal #4 rebar along internal inclined stringer throat section.
  • • Maintain 1.5" minimum clear cover from base soil and bottom step forms.
  • • Place 2x transverse rebar pins per tread for thermal crack control.
04. ASTM C309

Nosing Radius & Stripping

  • • Tool 3/8" to 1/2" radius rounded nosing edge on all treads within 2 hrs.
  • • Strip riser form faceboards after 4–6 hrs while green to sponge-finish face.
  • • Wet cure with moist burlap or curing compound for minimum 7 days.
STRUCTURAL GOVERNANCE Deterministic Mathematical Modeling

Engineering Methodology & Consensus Standards

PE / SE AUDITED & CODE-ALIGNED
STRUCTURAL DERIVATION & FIELD TOLERANCES
IRC R311.7 / IBC 1011 / ACI 318-19

Cálculo volumétrico e estrutural para escadas e degraus de concreto maciço em conformidade com as normas NBR 9050 e ACI 318. A ergonomia ideal segue a fórmula de Blondel (2 espelhos + 1 piso = 63 a 65 cm), com espelho máximo de 18 cm e piso mínimo de 28 cm. Requer ancoragem com barras de vergalhão CA-50 na fundação.

FORMULATION: DETERMINISTIC VOLUMETRIC TAKEOFF ZERO ESTIMATION DRIFT
PE
CIVIL & STRUCTURAL REVIEW BOARD CivilMatrix Technical Editorial Team | PE / SE Validated
CODE-ALIGNED
Consensus Code Grounding:

ACI 318-19 §25.4, ASTM C94/C94M, ASTM D698, ASTM C90, IBC 2024.

Editorial Review Standards:

Deterministic mathematical modeling based strictly on published building codes. Zero promotional bias.

LAST TECHNICAL CALIBRATION: November 2026 • v2.4
JOB-SITE DIRECTORY

Job-Site Technical Frequently Asked Questions

ACI 318 • ASTM C94 Standard Solutions
Q Quanto de concreto é necessário para uma escada de 3 degraus?
A

Para 3 degraus de 1,2 m de largura com patamar de 1 m, são necessários cerca de 0,95 m³ de concreto estrutural (ou cerca de 65 sacos de 25 kg).

Q Quais as medidas padrão confortáveis para degraus de concreto?
A

Pela norma NBR 9050, a altura do espelho deve ficar entre 16 e 18 cm, e a profundidade do piso (pisada) entre 28 e 32 cm.

Q How much concrete do I need for 3 steps with a landing?
A

For 3 standard steps (4 ft wide, 11-inch tread, 7-inch riser) with a 3-ft landing platform, you need approximately 1.25 net cubic yards (1.38 gross cu yd with 10% safety waste), or 63 bags of 80 lb pre-mixed concrete.

Q What is the standard riser height and tread depth for concrete steps?
A

IRC Section R311.7 and IBC 1011 enforce a maximum riser height of 7.75 inches (7 inches for commercial code) and a minimum tread run of 10 to 11 inches. The 7-11 proportion provides optimal ergonomic safety.

Q Do concrete steps require rebar dowel reinforcement?
A

Yes. ACI 318 recommends #4 (1/2-inch) deformed steel dowels drilled and epoxied into the foundation, plus two transverse #4 rebar bars per tread course to resist shear and prevent frost-heave separation.

Q How is formwork contact area calculated for concrete steps?
A

Total formwork contact surface equals the sum of two stepped side stringers (2x profile area), plus the vertical face area of all riser boards, and the rear landing bulkhead.