CM
CIVILMATRIX LAB
LEGAL TERMS • STRUCTURAL ENGINEERING DISCLAIMER

Terms of Service & Structural Engineering Disclaimer

Last Updated: November 18, 2026 • Version 2.4 • Mandatory PE Verification Requirement
⚠️

CRITICAL NOTICE: MANDATORY PROFESSIONAL ENGINEER (P.E. / S.E.) VERIFICATION

Preliminary Estimation Only • Not Certified Construction Drawings

IMPORTANT: All volumetric takeoffs, Bills of Materials (BOM), reinforcing bar schedules, concrete yardage estimates, and cross-sectional diagrams generated by CivilMatrix Lab are deterministic computational models engineered strictly for preliminary trade estimation, procurement scheduling, and budgeting.

NOTHING CONTAINED ON CIVILMATRIX LAB CONSTITUTES A CERTIFIED STRUCTURAL BLUEPRINT OR GEOTECHNICAL SOILS INVESTIGATION. All foundations, loadbearing slabs, Sonotube piers, retaining walls, and reinforcement schedules for permitted construction MUST BE AUDITED, VERIFIED, AND STAMPED BY A LICENSED PROFESSIONAL ENGINEER (P.E.) OR STRUCTURAL ENGINEER (S.E.) IN ACCORDANCE WITH LOCAL JURISDICTIONAL BUILDING CODES.

01. Agreement to Terms

By accessing or using CivilMatrix Lab (civilmatrixlab.com), you agree to be bound by these Terms of Service and all applicable local, national, and international laws. If you do not agree with any of these terms, you are prohibited from using or accessing this platform.

02. Intellectual Property & Permitted Use

The computation engines, user interfaces, branding, SVG diagram generators, and editorial contractor guides on CivilMatrix Lab are the exclusive intellectual property of CivilMatrix Lab and publisher Ikbal Shahid.

Permitted Actions:
  • Executing calculations for personal, commercial, or trade project planning.
  • Exporting and printing generated Bills of Material (BOM) for jobsite procurement.
  • Sharing direct URLs to specific calculation models and dimensions.
Strictly Prohibited Actions:
  • Automated scraping, bulk extraction, or algorithmic querying of our calculation engines.
  • Reverse engineering or reproducing our code or equations to build competing platforms.
  • Framing or embedding our calculation engines into external websites without express written consent.

03. Disclaimer of Warranties ("AS IS")

CIVILMATRIX LAB AND ALL TOOLS, CALCULATIONS, FORMULAS, AND ADVICE ARE PROVIDED ON AN "AS IS" AND "AS AVAILABLE" BASIS WITHOUT WARRANTIES OF ANY KIND, EITHER EXPRESS OR IMPLIED. WE EXPRESSLY DISCLAIM ALL WARRANTIES, INCLUDING BUT NOT LIMITED TO IMPLIED WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, TITLE, ACCURACY, AND NON-INFRINGEMENT.

We make no warranties that the calculations will meet your specific structural requirements, that calculations will be uninterrupted or error-free, or that results will prevent concrete cracking, settling, or structural failure under unpredictable soil or environmental stresses.

04. Limitation of Liability

TO THE MAXIMUM EXTENT PERMITTED BY APPLICABLE LAW, IN NO EVENT SHALL CIVILMATRIX LAB, ITS FOUNDER (IKBAL SHAHID), EDITORIAL BOARD MEMBERS, LICENSED ADVISORS, EMPLOYEES, OR SUPPLIERS BE LIABLE FOR ANY DIRECT, INDIRECT, PUNITIVE, INCIDENTAL, SPECIAL, CONSEQUENTIAL, OR EXEMPLARY DAMAGES, INCLUDING WITHOUT LIMITATION:

  • Concrete shortage surcharges or cold-joint demolition costs.
  • Structural foundation cracking, settling, or structural failure.
  • Municipal building permit delays, fines, or code non-compliance penalties.
  • Subgrade moisture vapor intrusion or rebar corrosion damages.
  • Loss of profits, revenue, or business reputation resulting from the use or inability to use this platform.

In all cases, the user assumes 100% of the operational risk associated with site preparation, soil bearing capacity verification, concrete mix design, transit logistics, and reinforcement placement.

05. Jobsite Variables & Field Discrepancies

Calculations reflect ideal geometric volumes plus recommended industry standard margins (e.g. 10% concrete waste allowance). On-site construction reality routinely deviates due to:

  • Subgrade Irregularities: Sub-base over-excavation or uncompacted hollows directly increase concrete consumption.
  • Formwork Deflection: Hydrostatic pressure from wet concrete bowing wooden form boards adds volumetric demand.
  • Transit Delays (ASTM C94): Transit mixer delays exceeding 90 minutes or 300 drum revolutions risk premature hydration, requiring slump mitigation.
  • Soil Compaction (ASTM D698): Compaction loss in gravel, crushed stone, and fill requires contractor verification with nuclear density gauges or proof-rolling.

06. Governing Law & Legal Jurisdiction

These Terms of Service and any dispute or claim arising out of or in connection with them shall be governed by and construed in accordance with the laws of India, without regard to conflict of law principles. Any legal proceeding arising out of your use of CivilMatrix Lab shall be instituted exclusively in the competent courts of Cachar, Assam, India.

Questions Regarding Legal Terms

If you have questions regarding these Terms of Service or our Structural Engineering Disclaimer, please contact our administrative desk:

CivilMatrix Lab Legal Administration
Dakshin Krishnapur, Cachar, Assam 788013, India