CM
CIVILMATRIX LAB
ENGINE ACTIVE NBR 7211 / ASTM D698 / ASTM C33
COMPACTAÇÃO E CARGAS CONC-SPEC: NBR 7211 / ASTM D698 / ASTM C33

Calculadora de Agregados, Brita e Sub-Base Compactada

Calcule toneladas e metros cúbicos de brita 1, brita graduada (BGS), pedrisco e areia com fator de compactação Proctor e estimativa de caminhões caçamba.

System:
Presets:
Layer Depth 4 Inches
2" (Pathway) 4" (Driveway Base) 6"+ (Heavy Pad)
NBR 7211 / ASTM D698 / ASTM C33
ARCHITECTURAL BLUEPRINT LEGEND & SCHEMATICS CAD SCALE 1:1 DYNAMIC
Concrete Mass EL. 0.00' Screed
Rebar Mat 40d Tension Lap
Support Chairs CRSI 2.5' OC
Base / Bedding #57 Stone / Poly
SITE PROCUREMENT

Bill of Materials (BOM)

TOTAL READY-MIX CONCRETE ORDER ACI 318
-- --
RETAIL BAG EQUIVALENT --
NET SLAB VOLUME --
SPECIFICATIONS & LOGISTICS: CRSI / ASTM
Rebar Grid Linear Length: --
Total Reinforcing Weight: --
Sub-Base Stone Tonnage: --
Estimated Material Order Cost: --
CALIBRATED TO ACI 318-19 / ASTM C94 TOLERANCE ±0.05%

Evaluates surface evaporation rate against critical bleed capacity using the official ACI 305R / Menzel Nomograph. When evaporation exceeds 0.20 lb/ft²/hr (1.0 kg/m²/hr), rapid plastic shrinkage cracking is imminent.

Presets:
Ambient Air Temperature (Ta) 68°F
40°F (ACI 306R Cold) 70°F (Optimal) 110°F (Extreme Heat)
Concrete Mix Temperature (Tc) 68°F
50°F (Min Allowed) 65–75°F (Normal Batch) 95°F (Max ASTM C94)
Relative Humidity (r) 55%
10% (Arid Desiccation) 50% (Average) 90% (Saturated Air)
Wind Velocity 20" Above Slab (V) 8 mph
0 mph (Calm) 10 mph (Moderate Breeze) 30 mph (Severe Gale)
ACI 305R EVALUATED NOMOGRAPH FORMULA: MENZEL MODEL
E = [ (Tc)2.5 − r × (Ta)2.5 ] × [ 1 + 0.4 × V ] × 10−6
Thermal vapor gradient Δ: 15,238 Wind factor (1 + 0.4V): 4.20
Evaporation Rate E: 0.0721 lb/ft²/hr (0.352 kg/m²/hr)
SURFACE EVAPORATION DIAL ACI 305R §4.2
0.0 0.10 lb 0.20 lb 0.40+
0.072 lb/ft²/hr
(0.35 kg/m²/hr)
SAFE / LOW RISK
ACI 305R STATUS

Normal Curing Procedures Apply

Evaporation rate is safely below the bleed rate of concrete. Normal finishing operations and standard ASTM C309 membrane curing compound application are adequate.

✂️
CONTRACTION JOINT WINDOW

Early Saw-Cut Joint Timing & Depth Rule

Standard Hydration Window
RECOMMENDED SAWING WINDOW 8 – 14 Hours Post-placement window
MANDATORY DEPTH RULE Minimum D / 4 1.0" for 4" slab / 1.5" for 6" slab
MAX JOINT SPACING 24× to 30× Slab Depth 8'–10' for 4" slab / 12'–15' for 6" slab

Ideal temperature for controlled hydration. Cut contraction joints before final thermal contraction peak to prevent random uncontrolled diagonal slab cracking.

Actionable Jobsite Mitigation Protocol (ACI 305R §4.3) DYNAMIC ACTION REGIMEN
01. MONOMOLECULAR FILM OPTIONAL

Aliphatic Alcohol Retarder

Spray water-based monomolecular evaporation retarder immediately after screeding/bull-floating to form an elastic surface film reducing evaporation by up to 80%.

02. MICRO-DROPLET FOG NOT REQUIRED

Atomized Fog Misting

Deploy high-pressure atomizing fog nozzles upwind to saturate the air (>80% RH) directly over the pour. Never allow fog droplets to puddle on unhardened paste.

03. WINDBREAKS & SHADE MONITOR WIND

Perimeter Barriers

Erect 6-foot solid windbreaks on prevailing windward sides. Every 5 mph wind speed drop cuts evaporation by ~35%. Provide overhead tarps to block direct solar radiation.

04. CURING COMPOUND STANDARD REGIMEN

ASTM C309 Membrane

Apply ASTM C309 Type 1-D or Type 2 Class B white-pigmented curing compound at 200 sq ft/gal immediately after final finishing. In severe heat, follow with 7 days wet burlap.

ADVERTISEMENT
Sponsored Space • Policy Buffer Active
FIELD SPECIFICATION ASTM D698 / ASTM D2940 / AASHTO M288

Contractor & Field Execution Guidelines

01. Proof-Roll

Subgrade Proof-Rolling

  • • Strip all organic topsoil to stable cohesive subsoil stratum.
  • • Proof-roll with loaded tandem truck or heavy roller to detect ruts.
  • • Excavate soft clay pockets and backfill with structural coarse fill.
02. AASHTO M288

Geotextile Separation

  • • Install Class 2 non-woven needle-punched geotextile fabric over subgrade.
  • • Overlap rolls minimum 12"–18" along seams; stake or pin securely.
  • • Prevents stone from migrating down into wet clay under vehicle loads.
03. ASTM D698

Stratified Lift Compaction

  • • Place aggregate in loose lifts of maximum 3" to 4" thickness.
  • • Compact with vibratory plate compactor (>=3,500 lbs force) or roller.
  • • Achieve >=95% Standard Proctor maximum dry density per lift.
04. Drainage Pitch

Surface Runoff Pitch

  • • Grade sub-base with minimum 1/4" per foot (2% cross-slope) toward edges.
  • • Ensure water sheds rapidly into side swales to avoid pothole saturation.
  • • Top with 2" washed angular stone (#57 or pea gravel) for wear layer.
STRUCTURAL GOVERNANCE Deterministic Mathematical Modeling

Engineering Methodology & Consensus Standards

PE / SE AUDITED & CODE-ALIGNED
STRUCTURAL DERIVATION & FIELD TOLERANCES
ASTM D698 / ASTM D2940 / AASHTO M288

A compactação mecânica de materiais granulares reduz o volume de vazios. Conforme ensaios Proctor (ASTM D698 / ABNT NBR 7182), a Brita Graduada Simples (BGS) compacta cerca de 18% a 22%, enquanto a brita limpa compacta cerca de 15%. É fundamental prever essa margem na compra.

FORMULATION: DETERMINISTIC VOLUMETRIC TAKEOFF ZERO ESTIMATION DRIFT
PE
CIVIL & STRUCTURAL REVIEW BOARD CivilMatrix Technical Editorial Team | PE / SE Validated
CODE-ALIGNED
Consensus Code Grounding:

ACI 318-19 §25.4, ASTM C94/C94M, ASTM D698, ASTM C90, IBC 2024.

Editorial Review Standards:

Deterministic mathematical modeling based strictly on published building codes. Zero promotional bias.

LAST TECHNICAL CALIBRATION: November 2026 • v2.4
JOB-SITE DIRECTORY

Job-Site Technical Frequently Asked Questions

ACI 318 • ASTM C94 Standard Solutions
Q Quantas toneladas de brita transporta um caminhão caçamba trucado?
A

Um caminhão caçamba basculante trucado (3 eixos / 6x4) transporta tipicamente de 14 a 16 toneladas de agregados por viagem.

Q Qual é a melhor brita para base de piso ou calçada?
A

A Brita Graduada Simples (BGS) ou pó de pedra com brita 1 é a melhor opção para sub-base porque os finos travam os grãos angulares sob compactação.

Q How many tons does a tri-axle dump truck haul?
A

A commercial tri-axle dump truck carries 20 to 22 tons (approximately 14 to 15 cubic yards) of crushed stone or gravel.

Q What is the compaction factor for Crusher Run / DGA base?
A

Dense Grade Aggregate (DGA) compacts by approximately 20% (1.20x factor per ASTM D698 / D2940). Always order 20% extra loose volume.